Some of you may be wondering what has been going on with the new acquisitions. Well, so far I have done many of the case repairs on the bulk of them, but none are completed yet. Here's a quick summary of what's done and not done on the clocks I've started to restore.
8 Day Sperry Ogee:
- Veneer repairs done
- Case corners reglued
- Dust covers stained and ready to use
- Loose label fragments reglued
- Gong screws antiqued and reinstalled
- Piece of brown paper tape on backboard darkened to match (I didn't want to remove it but I wanted to hide it)
- Additional dial holes and movement mounting block holes patched
Still to do:
- Shellac touch-ups/wax polish
- Find and fit a wood dial (or make and paint one)
- Clean and repair the movement
- Make a minute hand to match the hour hand
- Fit missing parts (weight lines, hooks, weights, bob, etc)
- Painted stenciled glass
8 Day New Haven 2 Door Ogee:
- Veneer repairs to case
- Centre bar rebuilt, veneered, and installed
- Case corners reglued/repaired
- Bottom of case flattened and stained
- Extra dial holes filled
- Pulley repair
Still to do:
- Repair the doors (reglue, square-up, veneer patches, reinstall hinges properly, etc)
- Fit dust covers
- Shellac touch-ups/wax polish
- Find/fit a correct movement, dial, weights, hands, etc
- Painted tablet
Sperry & Shaw 8 Day Column Clock:
- Case repairs
- Veneer repairs
Still to do:
- Shellac touch-ups/wax polish
- Clean and repair movement
- Fit dust covers
E. W. Adams Wooden Works:
- Case repairs (reglue/clamp several pieces)
- Veneer repairs
Still to do:
- Shellac touch-ups/wax polish
- Fit dust covers
- Find/install movement, dial, and parts (this is still largely an empty case)
Jerome & Co. Column & Cornice Clock:
- Veneer repairs
Still to do:
- Shellac finish entire case/wax polish
- Clean and repair movement
- Fit dust covers
- Painted glasses
- Fit hands
C. & L. C. Ives Triple Decker:
- Veneer repairs & case touch-ups
- Cut and fit ivory escutcheon to lower door
- Tint lower door darker
- Cut, veneer, and fit top returns and glue blocks
- Chipped column repair
- Fit hands
Still to do:
- Fit mirror or tablet in centre
- Fit dust covers
- Shellac touch-ups/wax polish
- Clean and repair movement
- Cut, fit, and install rear crest stiffener strips
- Cut and install new (old) dial glass
Wadsworth Pillar & Scroll:
- Patterns cut and prepared (top scroll, base, side returns, etc scaled on the PC from an original)
- Front damaged veneer band pieces removed (wire nails removed) and reglued
Still to do:
A lot. I only just started this one.